|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ETAP® 115 Power System Engineering I 5-Day WorkshopChennai, India February 4-8, 2013 |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
TAMIL NADU TEACHER ELIGIBLITY TEST (TNTET) – 2012
For syllabus and question paper model downloading use following link…
Model Paper download click here
Source TRB website
Status of nuclear power 2010
Risø DTU has made its eighth report in the series: ‘Nuclear power and Nuclear Safety’, which gives a global overview of nuclear energy with a focus on safety and preparedness. This year’s report is a bit delayed because of the accident in Fukushima, which is also mentioned in the report that would normally cover only the year 2010.
The Radiation Research Division at Risø DTU was suddenly very busy in March 2011 when the accident in Fukushima began to unfold.
“In the first 14 days we couldn’t do anything but answer questions from the media and monitor the event in collaboration with the Danish Emergency Management Agency,” says Bent Lauritzen, Head of Programme in the Radiation Research Division at Risø DTU, and continues:
“The report was almost ready to be issued, but after the accident we didn’t think it made sense to send it out without mentioning the accident in Japan. Therefore, we have subsequently added a section to the report describing the development of the accident in detail.”
The accident in Japan is still ongoing, and authorities do not expect that there will be full control of the plant until early 2012. Therefore, it is primarily the first weeks of the accident that are described in the report, while the final analysis of the entire accident cannot be done yet.
To read more and Download report (Danish) click here
Openings at Risø
Researcher in Energy Systems Analysis
Deadline: 15.12.2010
Postdoc/Researcher in Transmission Electron Microscopy of Energy Materials
Deadline: 15.12.2010
Senior Researcher in Energy Systems Analysis
Deadline: 15.12.2010
PhD scholarship in battery chemistry
Deadline: 16.12.2010
PhD scholarship on symbiotic growth depressions in bioenergy and forage crops
Deadline: 20.12.2010
Ph.d.–stipendium i Analyse af Syd-Syd Samarbejdet med fokus på teknologi overførsel i Latin Amerika (in Danish)
Deadline: 22.12.2010
Udviklingsingeniør / Laboratorieansvarlig til SYSLAB (in Danish)
Deadline: 02.01.2011
Climate Change Experts
Deadline: 02.01.2011
Researcher for Oxide Functional Materials synthesis using Pulsed Laser Deposition
Deadline: 15.01.2011
To know more Visit Here
Floating Turbines Certification RenewablesBiz
Floating wind turbines would exponentially expand the geographic reach