v117-image

 

The first prototype blade for Vestas’ new V117-3.3 MW turbine has been manufactured at Vestas’ factory in Brighton, Colorado, USA. Vestas converted the factory into a modular and flexible production line capable of producing blades for both the V112 and V117 turbines. It demonstrates a further step of Vestas’ strategy of continuously optimising products and creating a flexible manufacturing capacity while reducing overall investment level.

For more info visit http://www.vestas.com

Advertisements